In the first quarter of 2026, E.ON Drive put eleven new fast-charging sites and one expansion into operation with 24 new fast chargers in total. Ten of the sites are hosted by Davidsen and Harald Nyborg, and the collaboration with the two partners is paying off.
Partnerships that are paying off
The collaboration with Davidsen and Harald Nyborg defines the quarter. Davidsen has put six sites into operation in Ikast, Allerød, Karlslunde, Brørup, Karise and Skive, and Harald Nyborg has added four in Rødekro, Frederiksværk, Brønderslev and Vejen. Together, the two partners account for ten of the quarter’s twelve sites and 20 of the 24 new fast chargers. At Max Burger in Ringsted, the site has finally been expanded. There was already one Alpitronic charger, and now three new Alpitronic HYC 400 chargers have been added. The most powerful chargers of the quarter are in Rødekro and Ringsted. Together, the sites show that the build-out happens in collaboration with partners across the country.
The new sites
All sites are equipped with Alpitronic fast chargers with CCS connectors. Here are the eleven new sites and the expansion in the order they went into operation:
- Borupgård Skolen, Smakkevej 2, Snekkersten: 1 Alpitronic HYC 50. In operation from 15 January.
- Davidsen, Neptunvej 1, Ikast: 2 Alpitronic HYC 200. In operation from 15 January.
- Davidsen, Sortemosevej 14, Allerød: 2 Alpitronic HYC 200. In operation from 19 January.
- Harald Nyborg, Kometvej 3, Rødekro: 2 Alpitronic HYC 400. In operation from 21 January.
- Harald Nyborg, Industrivej 1, Frederiksværk: 2 Alpitronic HYC 200. In operation from 27 January.
- Davidsen, Motorgangen 1, Karlslunde: 2 Alpitronic HYC 200. In operation from 10 February.
- Davidsen, Fabriksvej 3, Brørup: 2 Alpitronic HYC 200. In operation from 10 February.
- Davidsen, Solagervej 26, Karise: 2 Alpitronic HYC 200. In operation from 12 February.
- Davidsen, Bjørnevej 1, Skive: 2 Alpitronic HYC 200. In operation from 25 March.
- Harald Nyborg, Jernaldervej 4, Brønderslev: 2 Alpitronic HYC 200. In operation from 26 March.
- Max Burger, Klosterparks Allé 20, Ringsted: Expansion with 3 Alpitronic HYC 400 next to the existing Alpitronic charger. In operation from 27 March, two of the chargers from 30 March.
- Harald Nyborg, Industrivej Vest 2, Vejen: 2 Alpitronic HYC 200. In operation from 30 March.
How to use them
The new fast chargers are part of the E.ON Drive charging network in Denmark. Find the stations and start charging in the E.ON Drive Public app. If you have the E.ON Drive City Spot subscription, it applies at E.ON Drive charging stations in Denmark.
Facts about the new fast chargers
- Period: 1 January to 31 March 2026
- Eleven new fast-charging sites and one expansion with 24 new fast chargers in total
- Of which six sites at Davidsen and four at Harald Nyborg with 20 fast chargers in total
- Types: 18 Alpitronic HYC 200, 5 Alpitronic HYC 400 and 1 Alpitronic HYC 50
- Four of the Davidsen sites also have an AC charger
- Connector: CCS
- Find the stations in the E.ON Drive Public app